An economic impact study typically costs anywhere from the low five figures to well into six figures — and the honest answer to “how much will this cost” is always “it depends on scope.” That’s not a dodge; scope is the actual driver of price in this kind of work.
We field this question constantly from municipalities preparing grant applications and businesses building the case for a project ahead of investor or board review. This guide breaks down what actually moves the price, with real ranges, so you can budget before you call for a quote.
What Determines the Cost of an Economic Impact Study?
Six factors move the price more than anything else: geographic scope (a single community versus a multi-county region), how many industries or sectors need to be modeled, whether the study requires original primary data collection or can rely on existing data, how deep the modeling goes (direct effects only, or direct plus indirect plus induced), how comprehensive the final deliverable needs to be, and how compressed the timeline is.
A study measuring one project’s direct jobs and tax revenue for a single town costs far less than a study modeling a multi-industry project’s full ripple effect across a five-county region with original stakeholder interviews.
Typical Cost Ranges for an Economic Impact Study
In our experience, economic impact studies for North Carolina organizations follow the same scope-driven logic we see in feasibility study engagements: narrowly scoped, single-community studies built from existing data tend to land in the low five figures, while multi-industry or multi-region studies requiring original data collection and full direct/indirect/induced modeling reach into six figures.
Most of our economic impact analyses are completed in 6 to 12 weeks, and timeline is itself a cost driver — a compressed schedule that requires additional staff hours to hit a deadline costs more than a study that can run on a standard timeline.
How Much Does a Feasibility Study Cost?
Feasibility study costs follow a similar scope-driven range: low five figures for a narrowly scoped, single-dimension study — market demand only, for example — up to well into six figures for a comprehensive study spanning market, technical, financial, and legal feasibility together.
Organizations that come to the table with existing market data or prior studies to build from typically pay less than those starting from zero. If you’re not sure yet whether your project needs a feasibility study, an economic impact study, or both, our feasibility study guide walks through the full cost breakdown and what’s included at each scope level.
What’s Included at Each Price Point?
At the lower end — low five figures — you typically get a single-effect analysis focused on one metric (direct jobs and tax revenue, for example), built from existing secondary data, delivered as a shorter report covering one scenario.
At the higher end — well into six figures — the deliverable includes multi-industry direct, indirect, and induced modeling; original primary data collection through interviews or surveys; multiple scenarios, including a base case and a downside case; a full report with supporting appendices; presentation materials for board or public meetings; and several rounds of stakeholder review built into the timeline.
Not sure where your project falls on that range? A short scoping call gets you an accurate quote in minutes, not days.
Economic Impact Study vs. Cost-Benefit Analysis: Which Are You Actually Budgeting For?
If the real question is “will this project pay for itself,” you may actually be budgeting for a cost-benefit analysis rather than an economic impact study. Cost-benefit analysis is a related but different — and often less expensive — engagement focused on a project’s own financial return, not its ripple effect on the regional economy. Getting this distinction right before requesting a quote saves a round of re-scoping later.
Finding the Right Economic Impact Consultant for Your Budget
Cost isn’t the only variable that matters. The right economic impact consultant scopes the study to match what your board, funder, or investors actually need to see, rather than defaulting to the most comprehensive — and most expensive — option every time. A narrowly scoped study that answers the specific question your audience is asking is often the more strategic (and more affordable) choice.
Frequently Asked Questions
How much does an economic impact study cost?
Costs vary by scope, but most economic impact studies for NC organizations range from the low five figures for narrowly scoped, single-effect studies to well into six figures for comprehensive, multi-industry studies with original data collection.
How much does a feasibility study cost?
Feasibility study costs follow a similar range — low five figures for a single-dimension study, up to six figures for a comprehensive study spanning market, technical, financial, and legal feasibility.
What’s the difference between an economic impact study and a cost-benefit analysis, cost-wise?
A cost-benefit analysis is usually narrower in scope, focused on one project’s own financial return, and often costs less than a full economic impact study, which measures a wider set of regional economic effects.
How do I get an accurate quote for an economic impact study?
The most accurate way is a short scoping conversation. We ask about the project, the intended audience for the findings, and what data you already have, then quote based on the actual scope rather than a flat-rate estimate.
Get a Project-Specific Quote
Cost ranges are a starting point, not a substitute for scoping your actual project. Every study we quote is based on your project’s geography, industry mix, data availability, and timeline — not a generic price list.